Safe, contained removal of visible and hidden mold growth from walls, ceilings, framing and finishes, with HEPA air scrubbing and antimicrobial treatment.
Mold removal is the hands-on part of the job: containing the affected area, removing contaminated drywall, insulation and trim, cleaning structural surfaces and scrubbing the air with HEPA filtration so spores do not spread to the rest of the house.
We treat every mold removal project as a moisture problem first. Killing what you can see does nothing if the leak, condensation or humidity that fed it is still there, so the source is identified and corrected before surfaces are rebuilt.
Every city and county in Maryland, with local crews in the Baltimore metro, the DC suburbs, Frederick and Hagerstown, Western Maryland, Southern Maryland and the Eastern Shore.
Full-scope mold remediation following industry protocols: containment, negative air, removal, cleaning, drying and clearance testing.
Air and surface sampling, moisture mapping and thermal imaging to find hidden mold and confirm a home is clean after remediation.
Containment and removal of Stachybotrys and other dark-colored molds with full protective protocols and air clearance.
24/7 water extraction, structural drying, dehumidification and repair after burst pipes, appliance leaks, roof leaks and storms.
"A kitchen fire left the whole upstairs smelling like smoke. After the cleaning and fogging you would never know it happened."
Tom & Lisa K."Roof leak turned into ceiling mold. They dried it, removed the bad drywall and had it rebuilt within a week."
Brian T."Our basement flooded on a Saturday night and the crew was here before midnight. Everything was dry within three days and the mold test came back clean."
Rachel M.A musty or earthy smell, dark spots on walls or ceilings, peeling paint, warped drywall, allergy symptoms that improve when you leave the house, and any area that has been wet for more than 48 hours.
Most residential remediations take 1 to 5 days. Water damage drying adds another 3 to 5 days. Rebuild time depends on how much material had to be removed.
Small, contained jobs (a bathroom wall or a closet) often run in the hundreds to low thousands. Larger basement, attic or whole-house projects cost more because of containment, material removal and drying. We inspect first and give a written price before any work starts.